Intelligent efficient and stable parallel control cabinet
Description
Learn More The parallel control cabinet allows multiple diesel generator sets to run in parallel to form a unified power grid. This configuration can provide higher power supply capacity to meet the needs of large loads. At the same time, when one unit fails, other units can continue to supply power to avoid power outages. |
Product Detailed Description: The reliability and continuity of the power supply system of the synchronous panel control cabinet, because multiple units are connected in parallel to form a power grid, the power supply voltage and frequency are stable, and can withstand the impact of large load changes. According to the size of the online load, an appropriate number of low-power units can be invested to reduce the waste of fuel and oil products caused by the low-load operation of large-power units. The future expansion is more flexible, only the required power generation and parallel equipment need to be installed. When the company needs to expand the power grid capacity in the future, the generator set can be added and the units can be easily expanded. Connect them together to make the initial investment more economical. |
Product structure design: Parallel control cabinets usually adopt a modular structure, consisting of multiple functional modules, including main control module, display module, operation module, etc. This design facilitates maintenance and upgrades, and also improves the reliability of the system. |
Product safety performance: The design of the operating mechanism is rational, the operating method is convenient, and the safety of the operating system can be effectively avoided. At the same time, the external case is usually made of solid materials, which ensures the safety of the operating personnel. In order to control the quality of the production process, it has high flexibility and stability, and it can be used for a long time. |
|
1. Are you a manufacturer? If yes, where is your factory?
Yes, we are manufacturer, Our factory and headquarters are located in Minhou County, Fuzhou City, Fujian Province. China about 60 minutes' drive from Changle Airport and 30 minutes' drive from Fuzhou Railway Station. Mawei Harbor is the closest to us.
2. What can l buy from you?
Complete sets of distribution boxes, distribution panels, control panels, control boxes, power supply cabinets, electrical cabinets, etc. We have 15 years of experience in the electrical automation industry and are committed to providing customers with high and low voltage electrical control cabinets, distribution cabinets, explosion-proof cabinets, etc. Design, production and PLC programming of integrated power distribution and automation solutions.
3.How can l place an order with you?
You should first provide us with detailed technical specifications or SLD (single line diagram) or related drawings, etc. via email, WeChat, whatsapp, phone, etc. You can contact any of our sales staff at any time for quotation and further communication.
4.How long does it take to get a quote? What is the lead time?
After receiving the details, we will give you a quotation within 2 days. Generally speaking, it takes about 15 days for samples and about 26 days for mass production, The specific delivery time depends on the items and quantity of your order.
5.What are your payment terms?
We accept any flexible and fast payment method
Irrevocable letter of credit at sight. Pay 30% in advance as deposit + 70% of the balance after the goods are ready (support T/T, Paypal, Apple Pay, Google Pay, Western Union, WeChat. etc.)
6.Do you have an overseas technical team?
Yes, if you need it, our technical team can go to the site to guide installation, testing, debugging, maintenance, etc., and we can discuss it in detail.
7.lf we want to visit your factory, can you book a good hotel near the factory and pick us up from the airport or transportation?
No problem at all. lf you need an invitation letter before coming to China, we can provide it to you.